2010 Infrastructure Maintenance

Annual Alley Maintenance
Feutz paved the alleys bounded by 5th, 6th, Church and Park Streets; 4th, 5th, Eureka and Tremont Street. Punch list items remain.

Neighborhood Infrastructure Repair

  • Bristol Rd. from Harrington Dr. to Lynwood Dr.
  • Seaton Court
  • Galen Drive – 2600 Block
  • Lynn Street – 1000 Block
  • Clark Street – 500 Block

All sidewalk and curb and gutter repairs are complete. Sod placement and punch list items remain.

Brick Street Healey Street from Lynn Street to Elm Street
All brick pavement, sidewalk and curb and gutter repairs are complete. Sod placement and punch list items remain.

Paula Dr. from Garden Hills Drive to Melanie Lane
Sidewalk construction is complete. Sod placement and punch list items remain.

Neil and Kirby Pedestrian Crossing Improvements
ADA Sidewalk ramp re-construction, pedestrian push button improvements and crosswalk re-striping are complete. Sod placement and punch list items remain.