2015 Concrete Street Maintenance Project – Mayfair Road

As part of the City’s 2015 Concrete Street Maintenance Project, the pavement on Mayfair Road from Broadmoor Drive to Theodore Drive will be patched. The City’s contractor for the project, Stark Excavating, will begin work on Monday, July 20, 2015, weather permitting.
Please pay close attention to construction signs, traffic control devices and marked detours. Please do not park on the street near the construction site or in areas that are posted “No Parking.” Please proceed cautiously through construction zones and use alternate routes whenever possible. The contractor will attempt to complete construction activities as soon as possible to minimize any inconvenience to the residents in the areas of construction.
The City of Champaign would like to thank you for your cooperation and patience during this construction season. A map showing this location along with all 2015 City Engineering Division projects can be found atwww.ci.champaign.il.us/pwd, click on “2015 Construction Maps” under “Timely Topics.”