Tamarack Drive – 2016 Concrete Street Improvements Project

As part of the City’s 2016 Concrete Street Improvements Project, the concrete pavement on Tamarack Drive from Winchester Drive to Rebecca Drive is being rehabilitated. The City’s contractor for the project, Feutz Contractors, will continue working; weather permitting, Monday, July 18, 2016.
Beginning Monday July 18, 2016, Tamarack Drive will become a one lane, one-way street. Traffic flow will be from Rebecca Drive to Winchester Drive or west to east.
Please pay close attention to construction signs, traffic control devices and marked detours. Please do not park on the street near the construction site or in areas that are posted “No Parking.”  Please proceed cautiously through construction zones and use alternate routes whenever possible.  The contractor will attempt to complete construction activities as soon as possible to minimize any inconvenience to the residents in the areas of construction.
The City of Champaign would like to thank you for your cooperation and patience during this construction season.  A map showing this location along with all 2016 City Engineering Division projects can be found at www.ci.champaign.il.us/pwd, click on “2016 Construction Maps” under “Maps.”