City of Champaign News

Wednesday, May 7, 2014, weather permitting, Microsurfacing Contractors, LLC will begin slurry sealing the oil and chip type streets in the northern one-third of Champaign. The streets are located north of Church Street (see attached map). The residential streets will be closed for about four hours until the slurry is cured. Heavily traveled streets and…
(Read the Rest…)

We want all first graders to get a good start in reading, school, and library use. That’s why we bring first grade classes from Unit 4 and private schools to the library for a fun-filled visit, one school at a time. Book-related games and activities introduce students to the library’s wonderful collection of children’s materials….
(Read the Rest…)

In order to repair a damaged water main, Illinois American Water will close one eastbound lane of Kirby Avenue between Coronado Drive and Park Haven Drive.  The lane closure will begin on Thursday, May 1, 2014 and will reopen on Friday, May 2, 2014.  Eastbound traffic will be reduced to one lane in the area. Illinois American Water…
(Read the Rest…)

In order to repair a sanitary sewer service at 301 East Green Street, Mayfield Construction will be closing the eastbound lane of Green Street between Third Street and Fourth Street. The lane closure will begin on Monday, April 28, 2014, and will reopen on Monday, May 5, 2014, weather permitting. Eastbound traffic will be shifted around the…
(Read the Rest…)

An anonymous tip lead Champaign police detectives to a home in the 1200 block of Gertrude Avenue where five stolen handguns and one 12 gauge shotgun were recovered. “Champaign Police have been working diligently to remove unauthorized guns from our city streets.  In light of the recent shootings and shots fired calls, it is apparent…
(Read the Rest…)

In order to replace telecommunications conduit for AT&T, Western Utility will be closing one southbound lane of Mattis Avenue between Stonegate Drive and Kirby Avenue. The lane closure will occur Monday, April 28, 2014, through Friday, May 9, 2014. The lane will be closed during normal working hours from 7 a.m. to 6 p.m. and will be reopened overnight….
(Read the Rest…)

The City of Champaign has awarded a contract to Stark Excavating for the construction of the Washington Street drainage improvements. This project will consist of constructing a new detention basin and amenities along with an upgraded storm sewer system at the intersection of Washington and Russell Street. The basin improvements will be complete before the…
(Read the Rest…)

Page 52 of 214« First...102030...5051525354...607080...Last »