Items tagged: Galen Drive

Infrastructure Maintenance Project

Feutz Contractors have finished construction of the new sidewalk along Galen Drive between Broadmoor Drive and Theodore Drive as part of the sidewalk gap portion of the project. Several residents in the area have commented positively regarding the new sidewalk. As part of this project we were able to include new sidewalk at Fire Station…
(Read the Rest…)

Infrastructure Maintenance Projects

Feutz Contractors has started construction on the Infrastructure Maintenance Project and are working in three locations. Location 1 – Feutz is constructing new sidewalk on both sides of Galen Drive between Broadmoor Drive and Theodore Drive as part of the sidewalk gap portion of the project. Location 2 – Feutz has started repairing sidewalk and…
(Read the Rest…)