Items tagged: Gregory Drive

Gregory Drive Lane Closure (at the intersection of Third Street)

In order to perform storm sewer repairs, SNC Construction will be closing the south lane of eastbound Gregory Drive at the intersection of Third Street. Both eastbound and westbound thru traffic will follow a slight lane shift utilizing the north half of the intersection pavement. All travel at intersections will remain unaffected by this work. […]


Campus Signals to Change to Four-Way Stops Over Break

Due to decreased vehicle and pedestrian traffic during summer break, several Campus traffic signals have been adjusted to act as a four-way stop by continuously flashing red. This change will go into effect on Monday, May 13, 2019. Normal signal operations will resume Friday, August 16, 2019. The signals are at the intersections of: • […]


Campus Signals to Change to Four-Way Stops Over Break

Due to decreased vehicle and pedestrian traffic during winter break, several campus traffic signals have been adjusted to act as a four-way stop by continuously flashing red.  The traffic signals were adjusted today, Friday, December 21, 2018.  Normal signal operations will resume Friday, January 11, 2019.  The signals are at the intersections of: • Fourth […]


First Street Construction Update

Stark Excavating began construction on First Street between Kirby Avenue and Gregory Drive on May 16.  The construction consists of the replacement of existing PCC pavement, new storm sewers, new PCC sidewalk, and new street lights.  This work has an interim completion date of August 12, which is prior to the move-in date for the […]


First Street Road Closure (Stadium Drive to Gregory Drive)

In order to complete street improvements, the City of Champaign will be closing First Street from Gregory Drive to Stadium Drive.  The proposed improvements will include the construction of a new storm sewer, street light, pedestrian crossing, and PCC pavement.   The closure will begin on Monday, May 16, 2016, and is scheduled to be […]