Items tagged: Road

Annual Asphalt Overlay Project

Starting June 2, 2014, Cross Construction Company will begin work on the City’s annual asphalt overlay project.  The work will consist of pavement patching, limited curb replacement, sidewalk ramp replacement, milling off a portion of the existing surface, paving two layers of new asphalt surface, manhole adjustments, and new pavement markings.  There will be intermittent…
(Read the Rest…)

Hickory Street Road Closure

In order to install electrical service at 11 E Columbia Avenue, Stephens Excavating will close Hickory Street between Columbia Avenue and Washington Street adjacent to the construction site. The road closure will begin on Wednesday, May 21, 2014, and will reopen on Wednesday, May 28, 2014, weather permitting. The road will be closed to through…
(Read the Rest…)

Interstate 57/74 Ramp Closures to begin May 20, 2014

Forwarded on behalf of Illinois Department of Transportation. The Illinois Department of Transportation announces that road work will begin on the Interstate 57/74 ramps on May 20, 2014 to improve the ride quality, improve the safety, and extend the service life of the ramps.  Radar speed signs will also be installed.  The ramps will be closed one…
(Read the Rest…)

Elm Street Road Closure

In order to repair brick pavement failures, Schomburg & Schomburg Contractors will close Elm Street between Springfield Avenue and Healey Street.  The closure will begin on Monday, May 19, 2014.  No through traffic will be allowed in the construction area. Properties with driveway access on of Elm Street will be closed for no more than seven…
(Read the Rest…)

Healey Street Road Closure

On Monday, May 19, 2014, A&R Services will begin work on the Healey Street Reconstruction Project. The work will consist of storm sewer improvements, new curb and gutter, new pavement and new sidewalk. Weather permitting, the major work items will be completed by Friday, August 15, 2014. The project limits are Healey Street from Fourth Street to…
(Read the Rest…)

Kirby Avenue Lane Closure

In order to repair a damaged water main, Illinois American Water will close one eastbound lane of Kirby Avenue between Coronado Drive and Park Haven Drive.  The lane closure will begin on Thursday, May 1, 2014 and will reopen on Friday, May 2, 2014.  Eastbound traffic will be reduced to one lane in the area….
(Read the Rest…)

Green Street Lane Closure

In order to repair a sanitary sewer service at 301 E Green St., Mayfield Construction will be closing the eastbound lane of Green Street between Third and Fourth Street.  The lane closure will begin on Monday, April 28, 2014 and will reopen on Monday, May 5, 2014, weather permitting.  Eastbound traffic will be shifted around…
(Read the Rest…)

Mattis Avenue Lane Closure

In order to replace telecommunications conduit for AT&T, Western Utility will be closing one southbound lane of Mattis Avenue between Stonegate Drive and Kirby Avenue.  The lane closure will occur Monday, April 28, 2014 through Friday, May 9, 2014.  The lane will be closed during normal working hours from 7:00 a.m. to 6:00 p.m. and…
(Read the Rest…)

  • No post found

  • Page 4 of 6« First...23456